WIND Β· OPERATIONAL

Penmanshiel

Penmanshiel is a 28.7 MW onshore wind farm in Scotland, operated by Cubico Sustainable Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningOct 2011 (completed)
  2. ConsentedOct 2013 (completed)
  3. ConstructionMay 2015 (completed)
  4. OperatingJul 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
28.7 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Cubico Sustainable Investments
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TD11 3RP
Coordinates
55.8969, -2.3213

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Penmanshiel compares

173rd of 488largest wind farms in the UK register
105th of 199in Scotland
0.10%of listed UK wind farms capacity
β‰ˆ 65 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 28.7 MW station would generate roughly 65 GWh of electricity in a year, similar to the annual use of about 24,210 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Cubico Sustainable Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Penmanshiel Wind Farm
Developer / operator
Renewable Energy Systems (RES)
Planning authority
Scottish Borders
Planning reference
11/01464/FUL
Application submitted
27 October 2011
Permission granted
16 October 2013
Construction started
6 May 2015
Began operating
1 July 2016
Capacity in planning record
28.7 MW
Address
Land East Of Penmanshiel Farmhouse Grantshouse Scottish Borders, Borders
REPD reference
4600

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026