Drone Hill
Drone Hill is a 28.6 MW onshore wind farm in Scotland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 28.6 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Greencoat Capital
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 55.8979, -2.2619
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Drone Hill compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 28.6 MW station would generate roughly 65 GWh of electricity in a year, similar to the annual use of about 24,130 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Greencoat CapitalNearby generating sites
- Penmanshiel Β· 28.7 MW onshore wind farm3.7 km
- Quixwood Moor Β· 26.7 MW onshore wind farm6.6 km
- Aikengall IIA Β· 81.7 MW onshore wind farm11.9 km
- Aikengall Β· 48 MW onshore wind farm14.4 km
- Aikengall II Β· 60.8 MW onshore wind farm14.4 km
- Black Hill Wind Farm Β· 28.6 MW onshore wind farm15.3 km
- Crystal Rig Β· 62.5 MW onshore wind farm15.7 km
- Crystal Rig III Β· 13.8 MW onshore wind farm16.0 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Greencoat UK Wind
- Planning authority
- Scottish Borders
- Planning reference
- 05/00425/FUL
- Application submitted
- 4 March 2005
- Permission granted
- 12 November 2007
- Construction started
- 1 April 2011
- Began operating
- 1 September 2012
- Capacity in planning record
- 28.6 MW
- Address
- Coldingham East Berwickshire, Borders
- REPD reference
- 4023
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.