WIND Β· OPERATIONAL

Crystal Rig

Crystal Rig is a 62.5 MW onshore wind farm in Scotland, operated by Fred Olsen Renewables. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland

Key facts

Installed capacity
62.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Fred Olsen Renewables
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EH42 1SH
Coordinates
55.8951, -2.5133

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Crystal Rig compares

87th of 488largest wind farms in the UK register
46th of 199in Scotland
0.21%of listed UK wind farms capacity
β‰ˆ 142 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 62.5 MW station would generate roughly 142 GWh of electricity in a year, similar to the annual use of about 52,720 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Fred Olsen Renewables

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Crystal Rig Phase 1
Developer / operator
Fred Olsen Renewables
Planning authority
Scottish Government (S36)
Planning reference
01/00269/FUL
Application submitted
1 April 2001
Permission granted
22 January 2003
Began operating
30 June 2004
Capacity in planning record
62.5 MW
Address
Crystal Rig, Scottish Borders, Borders
REPD reference
3114

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026