Brockloch Rig 1

Brockloch Rig 1 is a 21.6 MW onshore wind farm in Scotland, operated by Fred Olsen Renewables. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningJul 1995 (completed)
  2. ConsentedMar 1996 (completed)
  3. Construction (completed)
  4. OperatingOct 1996 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
21.6 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Fred Olsen Renewables
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
KA16 0TU
Coordinates
55.2971, -4.1829

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Brockloch Rig 1 compares

216th of 488largest wind farms in the UK register
132nd of 199in Scotland
0.07%of listed UK wind farms capacity
β‰ˆ 49 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 21.6 MW station would generate roughly 49 GWh of electricity in a year, similar to the annual use of about 18,220 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Fred Olsen Renewables

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Brochloch Rig 1 (formerly Windy Standard)
Developer / operator
Fred Olsen Renewables
Planning authority
Dumfries and Galloway
Application submitted
24 July 1995
Permission granted
7 March 1996
Began operating
1 October 1996
Capacity in planning record
21.6 MW
Address
Windy Standard, Dumfries and Galloway
REPD reference
4527

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026