Brockloch Rig 1
Brockloch Rig 1 is a 21.6 MW onshore wind farm in Scotland, operated by Fred Olsen Renewables. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 21.6 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Fred Olsen Renewables
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- KA16 0TU
- Coordinates
- 55.2971, -4.1829
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Brockloch Rig 1 compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 21.6 MW station would generate roughly 49 GWh of electricity in a year, similar to the annual use of about 18,220 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Fred Olsen RenewablesNearby generating sites
- Windy Rig Β· 43.2 MW onshore wind farm2.5 km
- South Kyle Β· 240 MW onshore wind farm6.7 km
- Brockloch Rig Β· 61.5 MW onshore wind farm7.0 km
- Hare Hill I Β· 13.2 MW onshore wind farm8.1 km
- Sanquhar Β· 31.1 MW onshore wind farm10.1 km
- Drumjohn Β· 1 MW small hydro scheme10.2 km
- Whiteside Hill Β· 28.5 MW onshore wind farm11.8 km
- Wether Hill Β· 18.2 MW onshore wind farm12.0 km
Also operated by Fred Olsen Renewables
Fred Olsen Renewables operates 9 sites in the register. Largest first:
- Crystal Rig II Β· onshore wind farm138 MW
- Mid Hill Β· onshore wind farm75.9 MW
- Pauls Hill Β· onshore wind farm64.4 MW
- Crystal Rig Β· onshore wind farm62.5 MW
- Brockloch Rig Β· onshore wind farm61.5 MW
- Rothes Β· onshore wind farm50.6 MW
- Rothes II Β· onshore wind farm41.4 MW
- Crystal Rig III Β· onshore wind farm13.8 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Brochloch Rig 1 (formerly Windy Standard)
- Developer / operator
- Fred Olsen Renewables
- Planning authority
- Dumfries and Galloway
- Application submitted
- 24 July 1995
- Permission granted
- 7 March 1996
- Began operating
- 1 October 1996
- Capacity in planning record
- 21.6 MW
- Address
- Windy Standard, Dumfries and Galloway
- REPD reference
- 4527
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.