Pauls Hill
Pauls Hill is a 64.4 MW onshore wind farm in Scotland, operated by Fred Olsen Renewables. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 64.4 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Fred Olsen Renewables
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- IV36 2RZ
- Coordinates
- 57.4461, -3.4761
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Pauls Hill compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 64.4 MW station would generate roughly 147 GWh of electricity in a year, similar to the annual use of about 54,320 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Fred Olsen RenewablesNearby generating sites
- Berry Burn Β· 67 MW onshore wind farm0.1 km
- Rothes II Β· 41.4 MW onshore wind farm12.2 km
- Rothes Β· 50.6 MW onshore wind farm16.9 km
- Hill of Towie Wind Farm (GB) Β· 48.3 MW onshore wind farm21.2 km
- Dorenell Β· 177 MW onshore wind farm23.2 km
- Tom Nan Clach Β· 39.1 MW onshore wind farm25.6 km
- Cairnborrow Wind Energy Ltd Β· 10.3 MW onshore wind farm34.6 km
- Moy Β· 66 MW onshore wind farm35.0 km
Also operated by Fred Olsen Renewables
Fred Olsen Renewables operates 9 sites in the register. Largest first:
- Crystal Rig II Β· onshore wind farm138 MW
- Mid Hill Β· onshore wind farm75.9 MW
- Crystal Rig Β· onshore wind farm62.5 MW
- Brockloch Rig Β· onshore wind farm61.5 MW
- Rothes Β· onshore wind farm50.6 MW
- Rothes II Β· onshore wind farm41.4 MW
- Brockloch Rig 1 Β· onshore wind farm21.6 MW
- Crystal Rig III Β· onshore wind farm13.8 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Paul's Hill and Extension
- Developer / operator
- Fred Olsen Renewables
- Planning authority
- Scottish Government (S36)
- Planning reference
- IEC3/99
- Application submitted
- 30 September 2001
- Permission granted
- 31 March 2003
- Construction started
- 1 January 2004
- Began operating
- 1 April 2006
- Capacity in planning record
- 65 MW
- Address
- Paul's Hill, Bowlingalloch, Moray, (area is also known as Ballindalloch) (14km west of Charlestown, 13km north of Granthon on Spey), Grampian
- REPD reference
- 4687
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.