Berry Burn
Berry Burn is a 67 MW onshore wind farm in Scotland, operated by Statkraft. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 67 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Statkraft
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- IV36 2QH
- Coordinates
- 57.4466, -3.4754
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Berry Burn compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 67 MW station would generate roughly 153 GWh of electricity in a year, similar to the annual use of about 56,520 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by StatkraftNearby generating sites
- Pauls Hill Β· 64.4 MW onshore wind farm0.1 km
- Rothes II Β· 41.4 MW onshore wind farm12.1 km
- Rothes Β· 50.6 MW onshore wind farm16.8 km
- Hill of Towie Wind Farm (GB) Β· 48.3 MW onshore wind farm21.2 km
- Dorenell Β· 177 MW onshore wind farm23.2 km
- Tom Nan Clach Β· 39.1 MW onshore wind farm25.7 km
- Cairnborrow Wind Energy Ltd Β· 10.3 MW onshore wind farm34.5 km
- Moy Β· 66 MW onshore wind farm35.1 km
Also operated by Statkraft
Statkraft operates 11 sites in the register. Largest first:
- Baillie Β· onshore wind farm53 MW
- Andershaw Β· onshore wind farm36 MW
- Alltwalis Β· onshore wind farm23 MW
- Rheidol Hydro Scheme Gen 3 Β· hydroelectric station20.5 MW
- Rheidol Hydro Scheme Gen 2 Β· hydroelectric station20.5 MW
- Rheidol Hydro Scheme Gen 1 Β· hydroelectric station13.5 MW
- Rheidol Hydro Scheme Gen 4 Β· small hydro scheme1.25 MW
- Rheidol Hydro Scheme Gen 7 Β· small hydro scheme0.1 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Statkraft
- Planning authority
- Scottish Government (S36)
- Application submitted
- 19 September 2004
- Permission granted
- 10 August 2009
- Construction started
- 5 December 2012
- Began operating
- 30 May 2014
- Capacity in planning record
- 66.7 MW
- Address
- Adjacent to Paul's Hill Site Altyre Estate BallindalF, Grampian
- REPD reference
- 4261
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.