WIND Β· OPERATIONAL

Hill of Towie Wind Farm (GB)

Hill of Towie Wind Farm (GB) is a 48.3 MW onshore wind farm in Scotland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningNov 2002 (completed)
  2. ConsentedNov 2003 (completed)
  3. ConstructionSep 2010 (completed)
  4. OperatingJun 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
48.3 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
AB55 6YU
Coordinates
57.6228, -3.3410

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Hill of Towie Wind Farm (GB) compares

113th of 488largest wind farms in the UK register
60th of 199in Scotland
0.16%of listed UK wind farms capacity
β‰ˆ 110 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 48.3 MW station would generate roughly 110 GWh of electricity in a year, similar to the annual use of about 40,740 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Hill of Towie (Drummuir)
Developer / operator
Renewable Energy Systems (RES)
Planning authority
Moray
Planning reference
02/02099/EIA
Application submitted
15 November 2002
Permission granted
11 November 2003
Construction started
1 September 2010
Began operating
1 June 2012
Capacity in planning record
48 MW
Address
Hill of Towie, Knockan and McHattie's Cairn, Drummuir, Keith, Banffshire, Moray, Grampian
REPD reference
4014

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.