WIND Β· OPERATIONAL

Garreg Llwyd (GB)

Garreg Llwyd (GB) is a 30.4 MW onshore wind farm in Wales, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Key facts

Installed capacity
30.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
LD1 6YS
Coordinates
52.3396, -3.5501

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Garreg Llwyd (GB) compares

156th of 488largest wind farms in the UK register
12th of 43in Wales
0.10%of listed UK wind farms capacity
β‰ˆ 69 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 30.4 MW station would generate roughly 69 GWh of electricity in a year, similar to the annual use of about 25,640 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by RES Group

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.