Bryn Titli is a 9.9 MW onshore wind farm in Wales, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Wales
Key facts
- Installed capacity
- 9.9 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Venitent Energy Services
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SY18 6RX
- Coordinates
- 52.3672, -3.5656
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Bryn Titli compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 9.9 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,350 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Wales All run by Venitent Energy ServicesNearby generating sites
- Garreg Llwyd (GB) Β· 30.4 MW onshore wind farm3.2 km
- Cambrian Β· 58.5 MW onshore wind farm13.2 km
- P&L Β· 30.6 MW onshore wind farm16.0 km
- Rheidol Hydro Scheme Gen 5 Β· 0.08 MW small hydro scheme19.9 km
- Rheidol Hydro Scheme Gen 3 Β· 20.5 MW hydroelectric station20.4 km
- Rheidol Hydro Scheme Gen 2 Β· 20.5 MW hydroelectric station20.4 km
- Rheidol Hydro Scheme Gen 6 Β· 0.05 MW small hydro scheme20.4 km
- Rheidol Β· 2.4 MW onshore wind farm21.6 km
Also operated by Venitent Energy Services
Venitent Energy Services operates 33 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Bryn titli Windfarm
- Developer / operator
- Innogy
- Planning authority
- Powys
- Planning reference
- R42978D
- Application submitted
- 12 March 1993
- Permission granted
- 9 August 1993
- Began operating
- 1 June 1994
- Capacity in planning record
- 9.9 MW
- Address
- Bryntitli Platuae, North of Rhayader Powys, Powys
- REPD reference
- 3015
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.