Causeymire
Causeymire is a 48.3 MW onshore wind farm in Scotland, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 48.3 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Venitent Energy Services
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- KW1 5XR
- Coordinates
- 58.4294, -3.5086
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Causeymire compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 48.3 MW station would generate roughly 110 GWh of electricity in a year, similar to the annual use of about 40,740 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Venitent Energy ServicesNearby generating sites
- Halsary Β· 30 MW onshore wind farm3.7 km
- Bad a Cheo Β· 26.7 MW onshore wind farm4.7 km
- Camster Β· 50 MW onshore wind farm14.0 km
- Bilbster Β· 3.9 MW onshore wind farm15.2 km
- Burn of Whilk Β· 22.5 MW onshore wind farm17.4 km
- Achairn Β· 6 MW onshore wind farm17.9 km
- Baillie Β· 53 MW onshore wind farm18.2 km
- Dounreay Nuclear Site Β· 245 MW nuclear power station21.4 km
Also operated by Venitent Energy Services
Venitent Energy Services operates 33 sites in the register. Largest first:
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.