πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Burn of Whilk

Burn of Whilk is a 22.5 MW onshore wind farm in Scotland, operated by Eneco Wind UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningFeb 2007 (completed)
  2. ConsentedMar 2011 (completed)
  3. ConstructionMay 2014 (completed)
  4. OperatingAug 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
22.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Eneco Wind UK
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
58.3420, -3.2617

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Burn of Whilk compares

208th of 488largest wind farms in the UK register
126th of 199in Scotland
0.08%of listed UK wind farms capacity
β‰ˆ 51 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 22.5 MW station would generate roughly 51 GWh of electricity in a year, similar to the annual use of about 18,980 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Eneco Wind UK

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
RWE npower
Planning authority
Highland
Planning reference
06/00676/FULCA.
Application submitted
23 February 2007
Permission granted
30 March 2011
Construction started
30 May 2014
Began operating
7 August 2015
Capacity in planning record
22.5 MW
Address
Burn of Whilk Hill of Yarrows Caithness, Highland
REPD reference
4122

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.