Burn of Whilk is a 22.5 MW onshore wind farm in Scotland, operated by Eneco Wind UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 22.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Eneco Wind UK
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 58.3420, -3.2617
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Burn of Whilk compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 22.5 MW station would generate roughly 51 GWh of electricity in a year, similar to the annual use of about 18,980 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Eneco Wind UKNearby generating sites
- Camster Β· 50 MW onshore wind farm7.4 km
- Achairn Β· 6 MW onshore wind farm11.3 km
- Bilbster Β· 3.9 MW onshore wind farm11.9 km
- Bad a Cheo Β· 26.7 MW onshore wind farm13.1 km
- Causeymire Β· 48.3 MW onshore wind farm17.4 km
- Halsary Β· 30 MW onshore wind farm18.4 km
- Stroupster Β· 29.9 MW onshore wind farm27.4 km
- Moray Offshore Windfarm West Limited Β· 882 MW offshore wind farm31.0 km
Also operated by Eneco Wind UK
Eneco Wind UK operates 6 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- RWE npower
- Planning authority
- Highland
- Planning reference
- 06/00676/FULCA.
- Application submitted
- 23 February 2007
- Permission granted
- 30 March 2011
- Construction started
- 30 May 2014
- Began operating
- 7 August 2015
- Capacity in planning record
- 22.5 MW
- Address
- Burn of Whilk Hill of Yarrows Caithness, Highland
- REPD reference
- 4122
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.