WIND Β· OPERATIONAL

Halsary

Halsary is a 30 MW onshore wind farm in Scotland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningNov 2009 (completed)
  2. ConsentedSep 2013 (completed)
  3. ConstructionFeb 2020 (completed)
  4. OperatingMar 2021 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
30 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Scottish Power
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
KW12 6UW
Coordinates
58.4598, -3.4833

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Halsary compares

160th of 488largest wind farms in the UK register
94th of 199in Scotland
0.10%of listed UK wind farms capacity
β‰ˆ 68 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 30 MW station would generate roughly 68 GWh of electricity in a year, similar to the annual use of about 25,310 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Halsary Wind Farm
Developer / operator
Scottish Power Renewables
Planning authority
Highland
Planning reference
09/00399/FULCA
Application submitted
9 November 2009
Permission granted
19 September 2013
Construction started
1 February 2020
Began operating
31 March 2021
Capacity in planning record
34 MW
Address
Spittal, Caithness, Highland
REPD reference
4636

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.