WIND Β· OPERATIONAL

East Anglia One

East Anglia One is a 714 MW offshore wind farm in East of England, England, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • East of England
  • England
Project stageOperating
  1. PlanningNov 2012 (completed)
  2. ConsentedJun 2014 (completed)
  3. ConstructionMay 2018 (completed)
  4. OperatingJul 2020 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
714 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Scottish Power
Region
East of England
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
52.2313, 2.2493

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How East Anglia One compares

7th of 488largest wind farms in the UK register
1st of 48in East of England
2.4%of listed UK wind farms capacity
β‰ˆ 2,377 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 714 MW station would generate roughly 2,377 GWh of electricity in a year, similar to the annual use of about 880,280 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
East Anglia 1 (EA 1)
Developer / operator
Scottish Power Renewables
Planning authority
The Planning Inspectorate - National Infrastructure
Planning reference
ENO10025
Application submitted
21 November 2012
Permission granted
17 June 2014
Construction started
24 May 2018
Began operating
28 July 2020
Capacity in planning record
714 MW
Address
Offshore, East of England, Offshore, NR32
REPD reference
2524

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.