🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more →
← Back to atlas
NUCLEAR · Planned / development

Sizewell C

Sizewell C represents the next intended large-scale nuclear build after Hinkley Point C, extending the Suffolk nuclear cluster.

EPR Suffolk England
Site image Planned / development
Sizewell site reference view
Sizewell site reference view Current licensed image of the existing Sizewell site included as a location reference for the wider Sizewell C development area. Image credit: Simon Mortimer / Wikimedia Commons · CC BY-SA 2.0
EPR Technical views
EPR process diagram
New-build nuclear site arrangement
Large pressurised-water nuclear unit with primary loop, steam generators and conventional island export systems.

Station map context

OpenStreetMap view showing the actual atlas coordinate for Sizewell C, with a wider local view and a closer site-focused view.

Wider location

This view places the station in its surrounding district, coast or industrial corridor.

Approx. coordinate used: 52.213, 1.621

Closer site view

This tighter map makes the specific site position much clearer for the station record.

Marker placed on the stored station coordinate in the atlas dataset.

Reference snapshot

StatusPlanned / development
FuelNuclear
TechnologyEPR
Capacity3,200 MW
CommissionedNot stated
ClosedNot stated
RegionSuffolk
NationEngland
OwnerSizewell C Ltd
OperatorSizewell C Ltd

Why it matters

  • Planned twin-unit EPR project
  • Successor project to Hinkley Point C model
  • Strategic future fleet site

This summary focuses on the key facts that explain the station’s role in the wider UK generation system.

Station timeline

These timeline entries highlight the main milestones for the site, including commissioning, major changes, closure and current status where relevant.

2020 Project era

Represents the new-build phase of British nuclear policy.

2026 Context

Included in Octary so the atlas shows not only what was and is, but also what may come next.

Reading the landscape

Power-station siting reflects engineering requirements, fuel and water logistics, grid access, industrial geography and the planning frameworks of the period in which the site was developed. Sizewell C should therefore be read as part of a wider infrastructure system rather than as an isolated structure in the landscape.

Approx. coordinates: 52.213, 1.621

Source notes

  • Operational fleet context uses EDF’s January 2026 fleet update. Magnox and legacy clean-up context uses NDA / Nuclear Restoration Services site portfolios.
  • Capacities and years in this historical reference layer are simplified reference figures and should be checked against primary records where exact regulatory or reporting precision is required.

Gallery notes

These notes highlight the main structures, layout characteristics and historic changes associated with the station. They are intended as a concise interpretive layer alongside the reference data, timeline and technical diagrams.

Further record development

This record can be expanded further with licensed site plans, archival photography, demolition or redevelopment updates, fuller unit-level timelines and linked planning or environmental documentation.