🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more →
← Back to atlas
NUCLEAR · Decommissioning

Dungeness A

Dungeness A belongs to the earlier Magnox generation and sits beside the later AGR station, making the site a compact lesson in reactor evolution.

Magnox Kent England Commissioned 1965 Closed 2006
Site image Decommissioning
Dungeness nuclear power station
Dungeness nuclear power station Dungeness nuclear station complex on the Kent shingle coast, with the wider station form visible from the beach. Image credit: Chris Allen / Wikimedia Commons · CC BY-SA 2.0
Magnox Technical views
Magnox process diagram
Coastal nuclear site arrangement
Early UK gas-cooled nuclear arrangement showing the reactor, heat exchangers, steam cycle and cooling system.

Station map context

OpenStreetMap view showing the actual atlas coordinate for Dungeness A, with a wider local view and a closer site-focused view.

Wider location

This view places the station in its surrounding district, coast or industrial corridor.

Approx. coordinate used: 50.912, 0.96

Closer site view

This tighter map makes the specific site position much clearer for the station record.

Marker placed on the stored station coordinate in the atlas dataset.

Reference snapshot

StatusDecommissioning
FuelNuclear
TechnologyMagnox
Capacity450 MW
Commissioned1965
Closed2006
RegionKent
NationEngland
OwnerNDA
OperatorNuclear Restoration Services

Why it matters

  • Magnox predecessor to Dungeness B
  • Closed in 2006
  • NRS site

This summary focuses on the key facts that explain the station’s role in the wider UK generation system.

Station timeline

These timeline entries highlight the main milestones for the site, including commissioning, major changes, closure and current status where relevant.

1965 Commissioned

Entered service in an earlier generation of the UK nuclear programme.

2006 Generation ended

The station stopped generating and entered post-operational work such as defuelling, care and maintenance, or site restoration.

2007 Long afterlife

Nuclear sites remain active long after closure because the clean-up cycle is measured in decades rather than months.

Reading the landscape

Power-station siting reflects engineering requirements, fuel and water logistics, grid access, industrial geography and the planning frameworks of the period in which the site was developed. Dungeness A should therefore be read as part of a wider infrastructure system rather than as an isolated structure in the landscape.

Approx. coordinates: 50.912, 0.96

Source notes

  • Operational fleet context uses EDF’s January 2026 fleet update. Magnox and legacy clean-up context uses NDA / Nuclear Restoration Services site portfolios.
  • Capacities and years in this historical reference layer are simplified reference figures and should be checked against primary records where exact regulatory or reporting precision is required.

Gallery notes

These notes highlight the main structures, layout characteristics and historic changes associated with the station. They are intended as a concise interpretive layer alongside the reference data, timeline and technical diagrams.

Further record development

This record can be expanded further with licensed site plans, archival photography, demolition or redevelopment updates, fuller unit-level timelines and linked planning or environmental documentation.