Whitelee II
Whitelee II is a 217 MW onshore wind farm in Scotland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 217 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Scottish Power
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- G76 0QQ
- Coordinates
- 55.6394, -4.3176
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Whitelee II compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 217 MW station would generate roughly 494 GWh of electricity in a year, similar to the annual use of about 183,070 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Scottish PowerNearby generating sites
- Whitelee I Β· 322 MW onshore wind farm5.2 km
- Calder Water Β· 39 MW onshore wind farm6.6 km
- West Browncastle Β· 30 MW onshore wind farm7.1 km
- AOE Β· 11.5 MW onshore wind farm8.1 km
- Kype Muir Wind Farm Β· 88.4 MW onshore wind farm13.9 km
- Dungavel Β· 26 MW onshore wind farm14.2 km
- East Kilbride Β· 0.6 MW onshore wind farm15.1 km
- Middleton Β· 12 MW onshore wind farm15.2 km
Also operated by Scottish Power
Scottish Power operates 42 sites in the register. Largest first:
- Longannet Power Station Β· coal-fired power station2,400 MW
- Cockenzie Power Station Β· coal-fired power station1,152 MW
- East Anglia One Β· offshore wind farm714 MW
- Whitelee I Β· onshore wind farm322 MW
- Kilgallioch Β· onshore wind farm239 MW
- Harestanes Β· onshore wind farm136 MW
- Black Law I Β· onshore wind farm124 MW
- Arecleoch Β· onshore wind farm120 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Whitelee Windfarm Extension phase 2
- Developer / operator
- Scottish Power
- Planning authority
- Scottish Government (S36)
- Planning reference
- WHX/02/040/0162
- Application submitted
- 29 May 2009
- Permission granted
- 12 December 2009
- Construction started
- 1 December 2010
- Began operating
- 15 January 2013
- Capacity in planning record
- 109 MW
- Address
- north of the Irvine Valley on Eaglesham Moor, Strathclyde
- REPD reference
- 2757
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.