Playters

Playters is a 8.63 MW solar farm in East of England, England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningApr 2014 (completed)
  2. ConsentedJul 2014 (completed)
  3. ConstructionMay 2015 (completed)
  4. OperatingFeb 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
8.63 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NR34 7TN
Coordinates
52.4330, 1.5918

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Playters compares

166th of 662largest solar farms in the UK register
33rd of 76in East of England
0.15%of listed UK solar farms capacity
β‰ˆ 7.6 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 8.63 MW station would generate roughly 7.6 GWh of electricity in a year, similar to the annual use of about 2,800 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Playters Solar Farm
Developer / operator
Anesco
Planning authority
East Suffolk
Planning reference
DC/14/1169/FUL
Application submitted
2 April 2014
Permission granted
22 July 2014
Construction started
15 May 2015
Began operating
26 February 2016
Capacity in planning record
8.6 MW
Address
Playters New Farm, Church Road, Ellough, Beccles, Suffolk, NR34 7TN
REPD reference
1889

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.