Bumpers Farm 2
Bumpers Farm 2 is a 12 MW solar farm in South East England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 12 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- HP27 9RE
- Coordinates
- 51.7515, -0.8826
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Bumpers Farm 2 compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 12 MW station would generate roughly 11 GWh of electricity in a year, similar to the annual use of about 3,900 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by AnescoNearby generating sites
- Ilmer Β· 5 MW solar farm0.2 km
- Bumpers Farm Β· 5 MW solar farm1.1 km
- Thame Β· 4.79 MW solar farm3.9 km
- Aston Clinton Β· 24.2 MW solar farm11.9 km
- Chalgrove Solar Limited Β· 21.3 MW solar farm15.2 km
- Chalgrove Β· 2.4 MW solar farm17.8 km
- Brook Farm Β· 8.91 MW solar farm19.3 km
- Great Seabrook Β· 4.97 MW solar farm19.5 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Appeal Granted
- Site name in planning record
- Bumpers Farm Phase 2
- Developer / operator
- Anesco
- Planning authority
- Buckinghamshire
- Planning reference
- 14/01926/APP
- Application submitted
- 11 July 2014
- Permission granted
- 26 October 2015
- Capacity in planning record
- 12 MW
- Address
- Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, Buckinghamshire, HP17 8
- REPD reference
- 6282
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.