πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Bumpers Farm 2

Bumpers Farm 2 is a 12 MW solar farm in South East England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningJul 2014 (completed)
  2. ConsentedOct 2015 (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
12 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
HP27 9RE
Coordinates
51.7515, -0.8826

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bumpers Farm 2 compares

104th of 662largest solar farms in the UK register
19th of 105in South East
0.21%of listed UK solar farms capacity
β‰ˆ 11 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 12 MW station would generate roughly 11 GWh of electricity in a year, similar to the annual use of about 3,900 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Appeal Granted
Site name in planning record
Bumpers Farm Phase 2
Developer / operator
Anesco
Planning authority
Buckinghamshire
Planning reference
14/01926/APP
Application submitted
11 July 2014
Permission granted
26 October 2015
Capacity in planning record
12 MW
Address
Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, Buckinghamshire, HP17 8
REPD reference
6282

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.