Thame
Thame is a 4.79 MW solar farm in South East England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 4.79 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- OX9 3QH
- Coordinates
- 51.7496, -0.9387
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Thame compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.79 MW station would generate roughly 4.2 GWh of electricity in a year, similar to the annual use of about 1,550 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by AnescoNearby generating sites
- Bumpers Farm Β· 5 MW solar farm2.9 km
- Ilmer Β· 5 MW solar farm3.6 km
- Bumpers Farm 2 Β· 12 MW solar farm3.9 km
- Chalgrove Solar Limited Β· 21.3 MW solar farm12.1 km
- Chalgrove Β· 2.4 MW solar farm14.6 km
- Aston Clinton Β· 24.2 MW solar farm14.8 km
- Brook Farm Β· 8.91 MW solar farm16.4 km
- Bicester Β· 18.4 MW solar farm19.1 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Thame solar farm
- Developer / operator
- Big 60 Million
- Planning authority
- South Oxfordshire
- Planning reference
- P14/S2242/FUL
- Application submitted
- 17 July 2014
- Permission granted
- 29 October 2015
- Construction started
- 16 September 2016
- Began operating
- 16 December 2016
- Capacity in planning record
- 4.3 MW
- Address
- Land to the east of Windmill Road, Towersey, Oxfordshire, OX9 3QH
- REPD reference
- 2068
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.