Aston Clinton
Aston Clinton is a 24.2 MW solar farm in South East England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 24.2 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- HP22 5DY
- Coordinates
- 51.8344, -0.7737
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Aston Clinton compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 24.2 MW station would generate roughly 21 GWh of electricity in a year, similar to the annual use of about 7,860 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Greencoat CapitalNearby generating sites
- Great Seabrook Β· 4.97 MW solar farm8.8 km
- Long Meadow Β· 4.12 MW solar farm9.0 km
- Church Farm - Slapton Β· 4.98 MW solar farm10.6 km
- Bumpers Farm 2 Β· 12 MW solar farm11.9 km
- Ilmer Β· 5 MW solar farm12.0 km
- Bumpers Farm Β· 5 MW solar farm12.9 km
- Thame Β· 4.79 MW solar farm14.8 km
- Manor Farm Eggington Β· 4.99 MW solar farm15.0 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Gib Lane (Aston Clinton solar park)
- Developer / operator
- CEE
- Planning authority
- Buckinghamshire
- Planning reference
- 14/02315/APP
- Application submitted
- 11 August 2014
- Permission granted
- 12 November 2014
- Construction started
- 1 December 2014
- Began operating
- 30 March 2015
- Capacity in planning record
- 24.2 MW
- Address
- Land To East Of Gib Lane, Bierton, Buckinghamshire, Buckinghamshire
- REPD reference
- 2239
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.