Tiln Solar is a 61.5 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 61.5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DN22 9JH
- Coordinates
- 53.3395, -0.9327
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Tiln Solar compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 61.5 MW station would generate roughly 54 GWh of electricity in a year, similar to the annual use of about 19,940 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by Greencoat CapitalNearby generating sites
- Moat Farm Β· 4.62 MW solar farm4.7 km
- Cottam Development Centre Β· 445 MW CCGT gas power station4.8 km
- Morton Solar Β· 28.1 MW solar farm5.4 km
- Little Morton Β· 14.3 MW solar farm5.6 km
- Thornham Β· 20.6 MW solar farm6.8 km
- West Burton CCGT Β· 1,332 MW CCGT gas power station8.3 km
- West Burton B Power Station Β· 1,332 MW power station9.2 km
- West Burton A Power Station Β· 2,012 MW coal-fired power station9.2 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Under Construction
- Site name in planning record
- Tiln Farm Solar Farm
- Developer / operator
- Lightsource SPV 154 Limited
- Planning authority
- Bassetlaw
- Planning reference
- 20/01405/FUL
- Application submitted
- 6 November 2020
- Permission granted
- 26 September 2023
- Capacity in planning record
- 49.9 MW
- Address
- Tiln Farm Land, Nottinghamshire, DN22 9JL
- REPD reference
- 7561
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.