πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Glen Kyllachy

Glen Kyllachy is a 48.5 MW onshore wind farm in Scotland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland

Key facts

Installed capacity
48.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Greencoat Capital
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
57.3206, -4.0856

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Glen Kyllachy compares

111th of 488largest wind farms in the UK register
58th of 199in Scotland
0.16%of listed UK wind farms capacity
β‰ˆ 110 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 48.5 MW station would generate roughly 110 GWh of electricity in a year, similar to the annual use of about 40,910 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Glen Kyllachy Wind Farm
Developer / operator
Greencoat UK Wind
Planning authority
Highland
Planning reference
13/02441/FUL
Application submitted
28 June 2013
Permission granted
22 April 2015
Began operating
1 January 2022
Capacity in planning record
48.5 MW
Address
10 miles south of Inverness, 3 miles south-east of the B851 and 3 miles west of the A9 trunk road and village of Tomatin, Highland
REPD reference
4371

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026