πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
HYDRO Β· OPERATIONAL

River E

River E is a 3 MW small hydro scheme in Scotland, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Small Hydro
  • Scotland

Key facts

Installed capacity
3 MW
Status
Operational
Technology
Hydro Β· Small Hydro
Operator
RWE Npower
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
57.2302, -4.4639

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How River E compares

63rd of 125largest hydro schemes in the UK register
55th of 109in Scotland
0.20%of listed UK hydro schemes capacity
β‰ˆ 9.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 35% of the maximum possible output), a 3 MW station would generate roughly 9.2 GWh of electricity in a year, similar to the annual use of about 3,410 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Hydroelectric stations generate electricity from water flowing downhill through turbines, either from a reservoir behind a dam or from a river (run-of-river). Most UK hydro capacity is in Scotland and Wales.

All UK hydro schemes and pumped-storage stations Hydro schemes and pumped-storage stations in Scotland All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
River E Hydro Scheme
Developer / operator
RWE npower
Planning authority
Highland
Planning reference
IN2003978
Application submitted
20 December 2002
Permission granted
23 May 2005
Began operating
1 November 2007
Capacity in planning record
3 MW
Address
River E Loch Mhor Loch Ness, Highland
REPD reference
428

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026