WIND Β· OPERATIONAL

London Array

London Array is a 630 MW offshore wind farm in South East England, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • South East
  • England
Project stageOperating
  1. PlanningJun 2005 (completed)
  2. ConsentedSep 2007 (completed)
  3. ConstructionMar 2011 (completed)
  4. OperatingApr 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
630 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
RWE Npower
Region
South East
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
51.6217, 1.4958

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How London Array compares

8th of 488largest wind farms in the UK register
1st of 7in South East
2.1%of listed UK wind farms capacity
β‰ˆ 2,097 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 630 MW station would generate roughly 2,097 GWh of electricity in a year, similar to the annual use of about 776,720 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in South East All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
London ArrayΒ Phase 1
Developer / operator
Siemens Gamesa Renewable Energy
Planning authority
DECC (S36)
Application submitted
1 June 2005
Permission granted
5 September 2007
Construction started
1 March 2011
Began operating
6 April 2013
Capacity in planning record
630 MW
Address
12 miles (20km) off the Kent and Essex coasts, Offshore
REPD reference
2511

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.