Gunfleet Sands 01

Gunfleet Sands 01 is a 173 MW offshore wind farm in East of England, England, operated by Orsted. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • East of England
  • England
Project stageOperating
  1. PlanningMar 2002 (completed)
  2. ConsentedMar 2004 (completed)
  3. ConstructionApr 2009 (completed)
  4. OperatingJul 2009 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
173 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Orsted
Region
East of England
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
51.7308, 1.2180

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Gunfleet Sands 01 compares

38th of 488largest wind farms in the UK register
5th of 48in East of England
0.59%of listed UK wind farms capacity
β‰ˆ 575 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 173 MW station would generate roughly 575 GWh of electricity in a year, similar to the annual use of about 213,040 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by Orsted

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Gunfleet Sands Offshore Wind Scheme
Developer / operator
Orsted (formerly Dong Energy)
Planning authority
DECC (S36)
Application submitted
1 March 2002
Permission granted
1 March 2004
Construction started
1 April 2009
Began operating
24 July 2009
Capacity in planning record
108 MW
Address
Gunfleet Sands 4 miles offshore from Holland-on-Sea Nr Clacton-on-Sea Essex, Offshore
REPD reference
2490

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.