WIND Β· OPERATIONAL

Hornsea 02

Hornsea 02 is a 1,386 MW offshore wind farm in Yorkshire and the Humber, England, operated by Orsted. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningJan 2015 (completed)
  2. ConsentedAug 2016 (completed)
  3. ConstructionSep 2019 (completed)
  4. OperatingAug 2022 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
1,386 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Orsted
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
53.6820, 1.4056

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Hornsea 02 compares

1st of 488largest wind farms in the UK register
1st of 31in Yorkshire and the Humber
4.7%of listed UK wind farms capacity
β‰ˆ 4,614 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 1,386 MW station would generate roughly 4,614 GWh of electricity in a year, similar to the annual use of about 1,708,780 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by Orsted

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Hornsea 2 - Optimus and Breesea
Developer / operator
Orsted (formerly Dong Energy)
Planning authority
The Planning Inspectorate - National Infrastructure
Planning reference
EN010053
Application submitted
30 January 2015
Permission granted
16 August 2016
Construction started
1 September 2019
Began operating
31 August 2022
Capacity in planning record
1,320 MW
Address
The Wash, Sutton Bridge, Offshore
REPD reference
2502

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.