West of Duddon Sands
West of Duddon Sands is a 389 MW offshore wind farm in North West England, operated by Orsted. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Offshore
- North West
- England
Key facts
- Installed capacity
- 389 MW
- Status
- Operational
- Technology
- Wind Β· Offshore
- Operator
- Orsted
- Region
- North West
- Country
- England
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 53.9851, -3.4620
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How West of Duddon Sands compares
At a typical UK load factor for this technology (about 38% of the maximum possible output), a 389 MW station would generate roughly 1,295 GWh of electricity in a year, similar to the annual use of about 479,590 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North West All run by OrstedNearby generating sites
- Walney 01 Β· 368 MW offshore wind farm7.0 km
- Walney 02 Β· 368 MW offshore wind farm7.0 km
- Barrow Β· 90 MW offshore wind farm10.7 km
- Ormonde Β· 150 MW offshore wind farm11.6 km
- Walney 03 Β· 330 MW offshore wind farm14.3 km
- Walney 04 Β· 329 MW offshore wind farm18.0 km
- Haverigg III Β· 3.4 MW onshore wind farm25.4 km
- Kirkby Moor Β· 4.8 MW onshore wind farm37.0 km
Also operated by Orsted
Orsted operates 16 sites in the register. Largest first:
- Hornsea 02 Β· offshore wind farm1,386 MW
- Hornsea 01 Β· offshore wind farm1,218 MW
- Race Bank Β· offshore wind farm573 MW
- Walney 01 Β· offshore wind farm368 MW
- Walney 02 Β· offshore wind farm368 MW
- Walney 03 Β· offshore wind farm330 MW
- Walney 04 Β· offshore wind farm329 MW
- Lincs Β· offshore wind farm270 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Scottish Power Renewables & Orsted (formerly Dong Energy)
- Planning authority
- DECC (S36)
- Application submitted
- 1 April 2006
- Permission granted
- 4 September 2008
- Construction started
- 21 May 2013
- Began operating
- 30 October 2014
- Capacity in planning record
- 389 MW
- Address
- Off Duddon Sands, Cumbria. East Irish Sea, Offshore
- REPD reference
- 2519
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.