Haverigg III
Haverigg III is a 3.4 MW onshore wind farm in North West England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- North West
- England
Key facts
- Installed capacity
- 3.4 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- WPO UK Services
- Region
- North West
- Country
- England
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 54.2003, -3.3305
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Haverigg III compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 3.4 MW station would generate roughly 7.7 GWh of electricity in a year, similar to the annual use of about 2,870 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North West All run by WPO UK ServicesNearby generating sites
- Kirkby Moor Β· 4.8 MW onshore wind farm14.2 km
- Ormonde Β· 150 MW offshore wind farm14.2 km
- Walney 04 Β· 329 MW offshore wind farm16.5 km
- Walney 01 Β· 368 MW offshore wind farm21.6 km
- Walney 02 Β· 368 MW offshore wind farm21.6 km
- Walney 03 Β· 330 MW offshore wind farm22.2 km
- Barrow Β· 90 MW offshore wind farm23.3 km
- West of Duddon Sands Β· 389 MW offshore wind farm25.4 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Haverigg Extension Wind Farm
- Developer / operator
- The Wind Company
- Planning authority
- Cumberland
- Planning reference
- 4/91/0463/0
- Application submitted
- 29 May 1991
- Permission granted
- 8 August 1991
- Began operating
- 1 July 1998
- Capacity in planning record
- 2.4 MW
- Address
- Kirksanton Airfield Part of Hemplands Farm Haverigg Millom Cumbria, Cumbria
- REPD reference
- 2626
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.