WIND Β· OPERATIONAL

Altaveedan

Altaveedan is a 18 MW onshore wind farm in Northern Ireland, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland

Key facts

Installed capacity
18 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
WPO UK Services
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
55.0779, -6.2819

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Altaveedan compares

240th of 488largest wind farms in the UK register
14th of 32in Northern Ireland
0.06%of listed UK wind farms capacity
β‰ˆ 41 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 18 MW station would generate roughly 41 GWh of electricity in a year, similar to the annual use of about 15,180 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by WPO UK Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Altaveedan Wind Farm
Developer / operator
NTR PLC
Planning authority
Causeway Coast and Glens
Planning reference
D/2010/0356/F
Application submitted
3 December 2010
Permission granted
28 October 2013
Construction started
15 September 2015
Began operating
24 April 2017
Capacity in planning record
17.9 MW
Address
in the townlands of Shelton South, Aldorough, Altaveedan North, Altaveedan South and Turnavedog near Loughguile, Co Antrim, Co. Antrim
REPD reference
3850

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.