πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Finvoy

Finvoy is a 5.96 MW solar farm in Northern Ireland, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Northern Ireland
Project stageOperating
  1. PlanningDec 2014 (completed)
  2. ConsentedAug 2015 (completed)
  3. ConstructionMay 2017 (completed)
  4. OperatingDec 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5.96 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT44 8SD
Coordinates
54.9638, -6.4930

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Finvoy compares

227th of 662largest solar farms in the UK register
9th of 16in Northern Ireland
0.11%of listed UK solar farms capacity
β‰ˆ 5.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.96 MW station would generate roughly 5.2 GWh of electricity in a year, similar to the annual use of about 1,930 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Northern Ireland All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Finvoy Road
Developer / operator
Lightsource Renewable Energy
Planning authority
Causeway Coast and Glens
Planning reference
D/2014/0234/F
Application submitted
4 December 2014
Permission granted
10 August 2015
Construction started
17 May 2017
Began operating
15 December 2017
Capacity in planning record
5.9 MW
Address
Lands to the West of 289 Finvoy Road, Rasharkin, Ballymena, Co. Antrim, BT44 8SD
REPD reference
4884

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.