WIND Β· OPERATIONAL

Brackagh Quarry

Brackagh Quarry is a 5 MW onshore wind farm in Northern Ireland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland
Project stageOperating
  1. PlanningFeb 2009 (completed)
  2. ConsentedJun 2010 (completed)
  3. ConstructionMay 2016 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT45 7JN
Coordinates
54.8112, -6.7082

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Brackagh Quarry compares

417th of 488largest wind farms in the UK register
28th of 32in Northern Ireland
0.02%of listed UK wind farms capacity
β‰ˆ 11 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 5 MW station would generate roughly 11 GWh of electricity in a year, similar to the annual use of about 4,220 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Draperstown (Brackagh) Wind Farm
Developer / operator
Renewable Energy Generation (REG)
Planning authority
Mid Ulster
Planning reference
H/2009/0075/F
Application submitted
9 February 2009
Permission granted
28 June 2010
Construction started
26 May 2016
Began operating
15 March 2017
Capacity in planning record
6 MW
Address
Creagh Concrete Products Ltd, Brackagh Quarry, 29 Disert Road, Draperstown, Magherafelt, Co. Derry / Londonderry
REPD reference
4361

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.