Altahullion Wind Farm (NI)
Altahullion Wind Farm (NI) is a 26 MW onshore wind farm in Northern Ireland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Northern Ireland
Key facts
- Installed capacity
- 26 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RES Group
- Region
- Northern Ireland
- Country
- Northern Ireland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BT47 4NS
- Coordinates
- 54.9600, -7.0317
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Altahullion Wind Farm (NI) compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 26 MW station would generate roughly 59 GWh of electricity in a year, similar to the annual use of about 21,930 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Northern Ireland All run by RES GroupNearby generating sites
- Altahullion Extension Wind Farm (NI) Β· 11.7 MW onshore wind farm0.0 km
- Dunmore Β· 21 MW onshore wind farm15.1 km
- CoolkeeraghESB C30 Β· 413 MW CCGT gas power station16.7 km
- CoolkeeraghESB GT8 Β· 53 MW oil-fired power station16.7 km
- Slieve Kirk Windfarm Β· 73.6 MW onshore wind farm17.0 km
- Brockaghboy Β· 47.5 MW onshore wind farm18.6 km
- Rigged Hill Β· 5 MW onshore wind farm19.9 km
- Bin Mountain Wind Farm Β· 9 MW onshore wind farm26.4 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Altahullion
- Developer / operator
- Renewable Energy Systems (RES) / BP Energy
- Planning authority
- Causeway Coast and Glens
- Application submitted
- 1 June 2001
- Permission granted
- 1 October 2001
- Began operating
- 1 May 2003
- Capacity in planning record
- 26 MW
- Address
- Alta Hullion Drum Dun Given Co. Londonderry, Co. Derry / Londonderry
- REPD reference
- 3575
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.