πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Altahullion Wind Farm (NI)

Altahullion Wind Farm (NI) is a 26 MW onshore wind farm in Northern Ireland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland
Project stageOperating
  1. PlanningJun 2001 (completed)
  2. ConsentedOct 2001 (completed)
  3. Construction (completed)
  4. OperatingMay 2003 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
26 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT47 4NS
Coordinates
54.9600, -7.0317

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Altahullion Wind Farm (NI) compares

186th of 488largest wind farms in the UK register
8th of 32in Northern Ireland
0.09%of listed UK wind farms capacity
β‰ˆ 59 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 26 MW station would generate roughly 59 GWh of electricity in a year, similar to the annual use of about 21,930 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Altahullion
Developer / operator
Renewable Energy Systems (RES) / BP Energy
Planning authority
Causeway Coast and Glens
Application submitted
1 June 2001
Permission granted
1 October 2001
Began operating
1 May 2003
Capacity in planning record
26 MW
Address
Alta Hullion Drum Dun Given Co. Londonderry, Co. Derry / Londonderry
REPD reference
3575

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.