Crossdykes Wind Farm
Crossdykes Wind Farm is a 48 MW onshore wind farm in Scotland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 48 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RES Group
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- DG11 2QL
- Coordinates
- 55.1803, -3.1656
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Crossdykes Wind Farm compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 48 MW station would generate roughly 109 GWh of electricity in a year, similar to the annual use of about 40,490 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by RES GroupNearby generating sites
- Solwaybank Β· 30.4 MW onshore wind farm5.5 km
- Craig Β· 10 MW onshore wind farm6.4 km
- Craig 2 Β· 4.7 MW onshore wind farm7.4 km
- Ewe Hill I Β· 13.8 MW onshore wind farm13.4 km
- Ewe Hill II Β· 36.8 MW onshore wind farm13.4 km
- Minsca Β· 36.8 MW onshore wind farm13.5 km
- Steven's Croft Β· 46 MW biomass power station14.0 km
- Chapelcross Β· 196 MW nuclear power station19.1 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
- Black Hill Wind Farm Β· onshore wind farm28.6 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Crossdykes
- Developer / operator
- Muirhall Energy
- Planning authority
- Dumfries and Galloway
- Planning reference
- 18/1706/FUL
- Application submitted
- 8 November 2018
- Permission granted
- 27 June 2019
- Construction started
- 15 August 2019
- Began operating
- 1 June 2021
- Capacity in planning record
- 48 MW
- Address
- Land Forming Part Of Crossdykes Farm, Dumfries and Galloway
- REPD reference
- 4633
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026