πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Crossdykes Wind Farm

Crossdykes Wind Farm is a 48 MW onshore wind farm in Scotland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningNov 2018 (completed)
  2. ConsentedJun 2019 (completed)
  3. ConstructionAug 2019 (completed)
  4. OperatingJun 2021 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
48 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
DG11 2QL
Coordinates
55.1803, -3.1656

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Crossdykes Wind Farm compares

115th of 488largest wind farms in the UK register
62nd of 199in Scotland
0.16%of listed UK wind farms capacity
β‰ˆ 109 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 48 MW station would generate roughly 109 GWh of electricity in a year, similar to the annual use of about 40,490 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Crossdykes
Developer / operator
Muirhall Energy
Planning authority
Dumfries and Galloway
Planning reference
18/1706/FUL
Application submitted
8 November 2018
Permission granted
27 June 2019
Construction started
15 August 2019
Began operating
1 June 2021
Capacity in planning record
48 MW
Address
Land Forming Part Of Crossdykes Farm, Dumfries and Galloway
REPD reference
4633

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.