WIND Β· OPERATIONAL

Ewe Hill II

Ewe Hill II is a 36.8 MW onshore wind farm in Scotland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningMar 2004 (completed)
  2. ConsentedMay 2014 (completed)
  3. ConstructionMar 2016 (completed)
  4. OperatingJan 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
36.8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Scottish Power
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
DG11 2QG
Coordinates
55.1071, -3.3339

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Ewe Hill II compares

138th of 488largest wind farms in the UK register
82nd of 199in Scotland
0.12%of listed UK wind farms capacity
β‰ˆ 84 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 36.8 MW station would generate roughly 84 GWh of electricity in a year, similar to the annual use of about 31,040 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Ewe Hill (extension)
Developer / operator
Scottish Power Renewables
Planning authority
Scottish Government (S36)
Application submitted
31 March 2004
Permission granted
16 May 2014
Construction started
30 March 2016
Began operating
15 January 2017
Capacity in planning record
36.8 MW
Address
Near Langham and Lockerbie, Dumfries and Galloway
REPD reference
3627

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.