Ewe Hill II
Ewe Hill II is a 36.8 MW onshore wind farm in Scotland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 36.8 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Scottish Power
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- DG11 2QG
- Coordinates
- 55.1071, -3.3339
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Ewe Hill II compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 36.8 MW station would generate roughly 84 GWh of electricity in a year, similar to the annual use of about 31,040 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Scottish PowerNearby generating sites
- Ewe Hill I Β· 13.8 MW onshore wind farm0.0 km
- Minsca Β· 36.8 MW onshore wind farm2.1 km
- Steven's Croft Β· 46 MW biomass power station5.9 km
- Solwaybank Β· 30.4 MW onshore wind farm10.4 km
- Chapelcross Β· 196 MW nuclear power station12.7 km
- Crossdykes Wind Farm Β· 48 MW onshore wind farm13.4 km
- Craig Β· 10 MW onshore wind farm18.0 km
- Minnygap (GB) Β· 25 MW onshore wind farm19.0 km
Also operated by Scottish Power
Scottish Power operates 42 sites in the register. Largest first:
- Longannet Power Station Β· coal-fired power station2,400 MW
- Cockenzie Power Station Β· coal-fired power station1,152 MW
- East Anglia One Β· offshore wind farm714 MW
- Whitelee I Β· onshore wind farm322 MW
- Kilgallioch Β· onshore wind farm239 MW
- Whitelee II Β· onshore wind farm217 MW
- Harestanes Β· onshore wind farm136 MW
- Black Law I Β· onshore wind farm124 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Ewe Hill (extension)
- Developer / operator
- Scottish Power Renewables
- Planning authority
- Scottish Government (S36)
- Application submitted
- 31 March 2004
- Permission granted
- 16 May 2014
- Construction started
- 30 March 2016
- Began operating
- 15 January 2017
- Capacity in planning record
- 36.8 MW
- Address
- Near Langham and Lockerbie, Dumfries and Galloway
- REPD reference
- 3627
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.