Dale Farm
Dale Farm is a 5 MW solar farm in Northern Ireland, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Northern Ireland
Key facts
- Installed capacity
- 5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- Northern Ireland
- Country
- Northern Ireland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BT80 9UU
- Coordinates
- 54.6557, -6.7121
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Dale Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Northern Ireland All run by AnescoNearby generating sites
- Crockandun Β· 15 MW onshore wind farm11.7 km
- Brackagh Quarry Β· 5 MW onshore wind farm17.3 km
- Slieve Divena Β· 30 MW onshore wind farm30.2 km
- Slieve Divena 2 Β· 18.8 MW onshore wind farm30.2 km
- Shantavny Β· 16.1 MW onshore wind farm31.0 km
- Millar Farm Β· 7.21 MW solar farm31.9 km
- Brockaghboy Β· 47.5 MW onshore wind farm32.6 km
- Crookedstone Β· 4.83 MW solar farm33.1 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Solar Farm DFD
- Planning authority
- Mid Ulster
- Planning reference
- LA09/2015/0885/F
- Application submitted
- 28 September 2015
- Permission granted
- 21 January 2016
- Construction started
- 15 September 2017
- Began operating
- 1 August 2018
- Capacity in planning record
- 4.9 MW
- Address
- Approx. 350m south of the Dale, 139 Moneymore Road, Cookstown, Co. Tyrone
- REPD reference
- 5852
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.