WIND Β· OPERATIONAL

Slieve Divena 2

Slieve Divena 2 is a 18.8 MW onshore wind farm in Northern Ireland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland
Project stageOperating
  1. PlanningSep 2005 (completed)
  2. ConsentedJun 2007 (completed)
  3. ConstructionMay 2016 (completed)
  4. OperatingFeb 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
18.8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Greencoat Capital
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
54.5086, -7.1064

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Slieve Divena 2 compares

234th of 488largest wind farms in the UK register
12th of 32in Northern Ireland
0.06%of listed UK wind farms capacity
β‰ˆ 43 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 18.8 MW station would generate roughly 43 GWh of electricity in a year, similar to the annual use of about 15,860 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Slieve Divena Phase 2 Wind Farm
Developer / operator
Scottish and Southern Energy (SSE)
Planning authority
Fermanagh and Omagh
Planning reference
K/2005/1691/F
Application submitted
13 September 2005
Permission granted
6 June 2007
Construction started
30 May 2016
Began operating
16 February 2017
Capacity in planning record
18.8 MW
Address
Slieve Divena Wind Farm Phase II in the townlands of Altcloghfin, Altamuskin and Shantavny Irish, Co Tyrone, Co. Tyrone, BT79
REPD reference
4054

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026