WIND Β· OPERATIONAL

Lendrums Bridge Wind Farm (NI)

Lendrums Bridge Wind Farm (NI) is a 5.94 MW onshore wind farm in Northern Ireland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland
Project stageOperating
  1. PlanningSep 1997 (completed)
  2. ConsentedMay 1998 (completed)
  3. Construction (completed)
  4. OperatingFeb 2000 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5.94 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT75 0LL
Coordinates
54.3927, -7.1834

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Lendrums Bridge Wind Farm (NI) compares

406th of 488largest wind farms in the UK register
27th of 32in Northern Ireland
0.02%of listed UK wind farms capacity
β‰ˆ 14 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 5.94 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,010 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Lendrum's Bridge Wind Farm
Developer / operator
Renewable Energy Systems (RES)
Planning authority
Mid Ulster
Application submitted
12 September 1997
Permission granted
11 May 1998
Began operating
1 February 2000
Capacity in planning record
5.9 MW
Address
Lendrum's Bridge Murley Road, Fivemiletown County Tyrone, Co. Tyrone
REPD reference
3568

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.