πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Low Farm

Low Farm is a 49.9 MW solar farm in South East England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningDec 2020 (completed)
  2. ConsentedMar 2021 (completed)
  3. ConstructionMar 2023 (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
49.9 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
South East
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
PE24 4JS

Location

No coordinates are published for this station.

How Low Farm compares

13th of 662largest solar farms in the UK register
2nd of 105in South East
0.88%of listed UK solar farms capacity
β‰ˆ 44 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 49.9 MW station would generate roughly 44 GWh of electricity in a year, similar to the annual use of about 16,190 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Under Construction
Site name in planning record
Low Farm Solar Farm
Developer / operator
Gresham House / Anesco Limited
Planning authority
East Lindsey
Planning reference
S/195/02340/20
Application submitted
22 December 2020
Permission granted
29 March 2021
Construction started
28 March 2023
Capacity in planning record
49.9 MW
Address
Low Farm, Lincolnshire, PE24 2LA
REPD reference
8053

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.