πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Crockandun

Crockandun is a 15 MW onshore wind farm in Northern Ireland, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland
Project stageOperating
  1. PlanningJan 2010 (completed)
  2. ConsentedNov 2012 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
15 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Capital Dynamics UK
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT80 9UA
Coordinates
54.7605, -6.7270

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Crockandun compares

271st of 488largest wind farms in the UK register
17th of 32in Northern Ireland
0.05%of listed UK wind farms capacity
β‰ˆ 34 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 15 MW station would generate roughly 34 GWh of electricity in a year, similar to the annual use of about 12,650 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by Capital Dynamics UK

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Brookfield Renewable Energy Group
Planning authority
Mid Ulster
Planning reference
H/2010/0009/F
Application submitted
8 January 2010
Permission granted
30 November 2012
Construction started
15 January 2016
Began operating
9 March 2017
Capacity in planning record
15 MW
Address
approximately 450m west south-west of junction of Cullion Road and Drumard Road, Draperstown, Magherafelt., Co. Derry / Londonderry, BT45 5NR
REPD reference
4156

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.