WIND Β· OPERATIONAL

Elginny

Elginny is a 23 MW onshore wind farm in Northern Ireland, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland
Project stageOperating
  1. PlanningMar 2011 (completed)
  2. ConsentedNov 2014 (completed)
  3. ConstructionMar 2017 (completed)
  4. OperatingMar 2018 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
23 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Capital Dynamics UK
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT43 7GZ
Coordinates
54.9326, -6.1929

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Elginny compares

206th of 488largest wind farms in the UK register
9th of 32in Northern Ireland
0.08%of listed UK wind farms capacity
β‰ˆ 52 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 23 MW station would generate roughly 52 GWh of electricity in a year, similar to the annual use of about 19,400 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by Capital Dynamics UK

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Elginny Hill
Developer / operator
Brookfields (Antrim Wind Energy)
Planning authority
Mid and East Antrim
Planning reference
G/2011/0041/F
Application submitted
15 March 2011
Permission granted
13 November 2014
Construction started
15 March 2017
Began operating
15 March 2018
Capacity in planning record
22 MW
Address
Carncoagh Hill, Elginny Hill, Clontrace Hill, Broughshane,, Co. Antrim
REPD reference
4563

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.