Wolf Bog
Wolf Bog is a 10 MW onshore wind farm in Northern Ireland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Northern Ireland
Key facts
- Installed capacity
- 10 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Scottish Power
- Region
- Northern Ireland
- Country
- Northern Ireland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BT39 0TD
- Coordinates
- 54.8043, -6.0806
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Wolf Bog compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,440 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Northern Ireland All run by Scottish PowerNearby generating sites
- Elliot's Hill Β· 5 MW onshore wind farm7.7 km
- Ballymena Β· 4.6 MW onshore wind farm10.7 km
- Millar Farm Β· 7.21 MW solar farm12.3 km
- Brett Martin Β· 6.49 MW solar farm14.9 km
- Elginny Β· 23 MW onshore wind farm16.0 km
- Crookedstone Β· 4.83 MW solar farm16.7 km
- NI Cluster Belfast Road Β· 9.99 MW solar farm18.9 km
- EP Ballylumford CCGT Β· 616 MW CCGT gas power station19.3 km
Also operated by Scottish Power
Scottish Power operates 42 sites in the register. Largest first:
- Longannet Power Station Β· coal-fired power station2,400 MW
- Cockenzie Power Station Β· coal-fired power station1,152 MW
- East Anglia One Β· offshore wind farm714 MW
- Whitelee I Β· onshore wind farm322 MW
- Kilgallioch Β· onshore wind farm239 MW
- Whitelee II Β· onshore wind farm217 MW
- Harestanes Β· onshore wind farm136 MW
- Black Law I Β· onshore wind farm124 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Wolf Bog Wind Farm
- Developer / operator
- B9 Energy / RES
- Planning authority
- Mid and East Antrim
- Planning reference
- G/2004/1532/F
- Application submitted
- 1 May 2004
- Permission granted
- 2 November 2005
- Began operating
- 1 November 2007
- Capacity in planning record
- 8.8 MW
- Address
- Wolf Bog, Tildarg, nr Ballyclare, Co. Antrim, Co. Antrim
- REPD reference
- 3242
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.