SOLAR Β· OPERATIONAL

Bann Road

Bann Road is a 45.8 MW solar farm in Northern Ireland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Northern Ireland
Project stageOperating
  1. PlanningSep 2014 (completed)
  2. Consented (completed)
  3. ConstructionFeb 2017 (completed)
  4. OperatingApr 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
45.8 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT44 8SD
Coordinates
54.9584, -6.5121

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bann Road compares

18th of 662largest solar farms in the UK register
1st of 16in Northern Ireland
0.81%of listed UK solar farms capacity
β‰ˆ 40 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 45.8 MW station would generate roughly 40 GWh of electricity in a year, similar to the annual use of about 14,840 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Northern Ireland All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bann Road (Rasharkin)
Developer / operator
Elgin Energy
Planning authority
Causeway Coast and Glens
Planning reference
D/2014/0181/F
Application submitted
19 September 2014
Construction started
6 February 2017
Began operating
6 April 2017
Capacity in planning record
18 MW
Address
Lands located North of Bann Road East/S.East of Ballmaconnelly Road West/S.West of Finvoy Road and North/N.West of Moneyleck Road Rasharkin - approx 200m E of No 41 Ballymaconnelly Road Rasharkin, Co. Antrim, BT44 8SZ
REPD reference
6506

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.