πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Garves

Garves is a 15 MW onshore wind farm in Northern Ireland, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland

Key facts

Installed capacity
15 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
WPO UK Services
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
55.0018, -6.5649

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Garves compares

271st of 488largest wind farms in the UK register
17th of 32in Northern Ireland
0.05%of listed UK wind farms capacity
β‰ˆ 34 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 15 MW station would generate roughly 34 GWh of electricity in a year, similar to the annual use of about 12,650 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by WPO UK Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Garves Mountain Farm
Developer / operator
Gravis Capital Management
Planning authority
Causeway Coast and Glens
Planning reference
D/2003/0329/F
Application submitted
11 June 2003
Permission granted
20 November 2006
Construction started
1 January 2009
Began operating
1 January 2009
Capacity in planning record
15 MW
Address
Garves Mountain Farm, Tullaghans Road (access adjacent to no. 91), Dunloy. Ballymoney, Co. Antrim
REPD reference
3191

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.