Twin Rivers
Twin Rivers is a 28.7 MW onshore wind farm in East Midlands England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- East Midlands
- England
Key facts
- Installed capacity
- 28.7 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- WPO UK Services
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 53.6565, -0.7781
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Twin Rivers compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 28.7 MW station would generate roughly 65 GWh of electricity in a year, similar to the annual use of about 24,210 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in East Midlands All run by WPO UK ServicesNearby generating sites
- Keadby Wind Farm Β· 68 MW onshore wind farm5.1 km
- Grange Wind Farm Β· 12.3 MW onshore wind farm5.5 km
- EPR Glanford Ltd Β· 14 MW biomass power station6.2 km
- Keadby 2 Β· 840 MW gas-fired power station6.9 km
- Keadby Β· 735 MW CCGT gas power station7.2 km
- Keadby 1 Power Station Β· 734 MW power station7.3 km
- Goole Fields A Β· 33 MW onshore wind farm7.4 km
- Goole Fields B Β· 34.9 MW onshore wind farm7.5 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.