SOLAR Β· OPERATIONAL

Exning

Exning is a 30.3 MW solar farm in East of England, England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England

Key facts

Installed capacity
30.3 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CB8 0XG
Coordinates
52.2499, 0.3633

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Exning compares

27th of 662largest solar farms in the UK register
9th of 76in East of England
0.54%of listed UK solar farms capacity
β‰ˆ 27 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 30.3 MW station would generate roughly 27 GWh of electricity in a year, similar to the annual use of about 9,820 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Vortex (formerly Sun Edison)
Planning authority
East Cambridgeshire
Planning reference
13/00878/ESF
Application submitted
22 October 2013
Permission granted
4 July 2014
Construction started
1 November 2014
Began operating
27 March 2015
Capacity in planning record
29.9 MW
Address
Land Off Heath Road, Burwell, Cambridgeshire
REPD reference
1913

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.