SOLAR Β· OPERATIONAL

Chittering

Chittering is a 4.99 MW solar farm in East of England, England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England

Key facts

Installed capacity
4.99 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CB25 9PW
Coordinates
52.3181, 0.2211

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Chittering compares

351st of 662largest solar farms in the UK register
50th of 76in East of England
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.99 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Chittering Solar Farm
Developer / operator
Abbey Renewables
Planning authority
South Cambridgeshire
Planning reference
S/2198/10
Application submitted
15 December 2010
Permission granted
15 March 2011
Began operating
28 June 2012
Capacity in planning record
5 MW
Address
Radical Farm, Chittering Drove, Chittering, Cambridgeshire, Cambridgeshire
REPD reference
1553

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.