πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Crundale

Crundale is a 43.7 MW solar farm in Wales, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningJul 2013 (completed)
  2. ConsentedDec 2013 (completed)
  3. ConstructionJun 2014 (completed)
  4. OperatingSep 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
43.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SA62 4PY
Coordinates
51.8195, -4.9189

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Crundale compares

19th of 662largest solar farms in the UK register
3rd of 75in Wales
0.77%of listed UK solar farms capacity
β‰ˆ 38 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 43.7 MW station would generate roughly 38 GWh of electricity in a year, similar to the annual use of about 14,170 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Fenton Home Farm
Developer / operator
Sunsave
Planning authority
Pembrokeshire
Planning reference
13/0278/PA
Application submitted
2 July 2013
Permission granted
5 December 2013
Construction started
4 June 2014
Began operating
12 September 2014
Capacity in planning record
31.3 MW
Address
Fenton Home Farm, Crundale, Haverfordwest, Dyfed, SA62 4PY
REPD reference
1765

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.