SOLAR Β· OPERATIONAL

Langton (FIT)

Langton (FIT) is a 4.35 MW solar farm in Wales, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningMar 2013 (completed)
  2. ConsentedNov 2013 (completed)
  3. ConstructionOct 2015 (completed)
  4. OperatingDec 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.35 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SA65 9RH
Coordinates
51.9647, -4.9931

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Langton (FIT) compares

507th of 662largest solar farms in the UK register
59th of 75in Wales
0.08%of listed UK solar farms capacity
β‰ˆ 3.8 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.35 MW station would generate roughly 3.8 GWh of electricity in a year, similar to the annual use of about 1,410 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Langton Farm Solar park
Developer / operator
Lightsource Renewable Energy
Planning authority
Pembrokeshire
Planning reference
12/1160/PA
Application submitted
18 March 2013
Permission granted
19 November 2013
Construction started
28 October 2015
Began operating
3 December 2015
Capacity in planning record
4.4 MW
Address
Land west of Langton Farm, Dwrbach, Fishguard, Pembrokeshire, Dyfed
REPD reference
1661

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026