WIND Β· OPERATIONAL

Wear Point Wind Farm

Wear Point Wind Farm is a 8.2 MW onshore wind farm in Wales, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. PlanningOct 2009 (completed)
  2. ConsentedMay 2010 (completed)
  3. ConstructionJun 2012 (completed)
  4. OperatingJul 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
8.2 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SA73 1DR
Coordinates
51.7021, -4.9965

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wear Point Wind Farm compares

358th of 488largest wind farms in the UK register
29th of 43in Wales
0.03%of listed UK wind farms capacity
β‰ˆ 19 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 8.2 MW station would generate roughly 19 GWh of electricity in a year, similar to the annual use of about 6,920 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Wear Point
Developer / operator
John Laing Environmental Assets Group
Planning authority
Pembrokeshire
Planning reference
09/0544/PA
Application submitted
2 October 2009
Permission granted
25 May 2010
Construction started
30 June 2012
Began operating
7 July 2014
Capacity in planning record
8.2 MW
Address
Land at Wear Point, Waterston Industrial, Llanstadwell, Dyfed
REPD reference
4661

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.