Dragon LNG is a 9.97 MW solar farm in Wales, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 9.97 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SA73 1DR
- Coordinates
- 51.7033, -5.0031
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Dragon LNG compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 9.97 MW station would generate roughly 8.7 GWh of electricity in a year, similar to the annual use of about 3,230 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by AnescoNearby generating sites
- Wear Point Wind Farm Β· 8.2 MW onshore wind farm0.5 km
- Castle Pill Farm 1 - A, C Β· 3.15 MW onshore wind farm2.3 km
- Pembroke Β· 2,199 MW gas-fired power station4.7 km
- Hoplass Β· 10.3 MW solar farm4.7 km
- Little Neath Β· 6.14 MW solar farm4.8 km
- West Farm Β· 7.63 MW solar farm7.0 km
- Chapel Hill Β· 10.1 MW solar farm7.8 km
- North Tenement Β· 5 MW solar farm8.3 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Dragon Long Meadow - Solar farm
- Developer / operator
- Dragon LNG Limited / Anesco Limited
- Planning authority
- Pembrokeshire
- Planning reference
- 21/0986/PAΒ
- Application submitted
- 22 December 2021
- Permission granted
- 14 January 2022
- Began operating
- 13 March 2023
- Capacity in planning record
- 9.9 MW
- Address
- Dragon LNG Meadow, The Land at West Perimeter Road, Milford HavenΒ , Dyfed, SA73 1DN
- REPD reference
- 10415
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.